Sign In | Join Free | My tjskl.org.cn
China Jiangsu Cheonny Overlay Co., Ltd. logo
Jiangsu Cheonny Overlay Co., Ltd.
Jiangsu Cheonny Overlay Co., Ltd.
Verified Supplier

5 Years

Home > Inconel Cladding Pipe >

UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm

Jiangsu Cheonny Overlay Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm

Model Number : Inconel cladding tube

Certification : ISO, ASME, EN

Place of Origin : CHINA

MOQ : 1000 tons

Price : Negotiable

Payment Terms : L/C, T/T, Western Union

Supply Ability : 1000 tons / months

Packaging Details : Iron Frame

Delivery Time : 30 working days

Application : Industry,oil and gas

Grade : Nickel Base Alloy,Inconel 625

Type : Nickel Pipe,Nickel tube/pipe

Shape : Inconel tube / pipe

Material : Inconel,Monel/Inconel/Incoloy/ hastelloy/PH Stainless steel,Inconel 600/UNS N06600

Standard : Inconel600,EN,ASTM

Contact Now

UNS N06600 N06601 Nickel Alloy Inconel Cladding Tube Oil Gas Transport Steel Tube

Production Information of Inconel Cladding Tube


Surfacing welding is a welding process in which a layer of wear-resistant, corrosion-resistant and heat-resistant metal layer is deposited on the surface or edge of the workpiece, and the metal is melted by electric welding or gas welding and stacked on the tool or machine parts

Material
Nickel alloy steel / Inconel Cladding Tube
Grade
N02200, N02201, N08020, N08330, N08800, N08810, N08811, N08825, N06600, N06601, N06625, N06686, N06690, N04400, N10276, N06059
Spec.
B161/163, B165, B167, B407, B423, B444, B462, B514, B515, B516, B517, B535, B619, B622, B626, B704, B705, B729
O.D.
6~219MM
W.T.
0.50~25MM
Length
6 Meters or customized
Finish
Annealed & Picked or OD Mechanical Polish(up to 600#) or Bright Annealed & OD Polish
Tolerance
As per spec.
Application
Petroleum, chemical industry, chemical fiber, smelt, medical machinery, paper making, heat preservation and refrigeration, mechanical equipment, food, electricity, water conservancy, architecture, aerospace, navigation shipbuilding, environmental protection and boiler heat exchanger.
Package
Standard seaworthy package: 1.plywood case 2.wooden pallet package 3.bundle packageand other package or as customer request.
MOQ
500 kilograms
Supply Ability
500 tons/month
Port
Shanghai
Payment Term
T/T with 30% deposit, balance before shipment
Delivery Time
Usually within 30-60 days after payment

UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm

The most common problem in surfacing is cracking. The main methods to prevent cracking are as follows


1. Preheat before welding, control interlayer temperature and slow cooling after welding

2. Stress relief heat treatment after welding

3. Avoid multi-layer surfacing and use low hydrogen surfacing electrode

4. If necessary, build up the transition layer between the surfacing layer and the base metal (use the electrode with low carbon equivalent and high toughness)

Attention must be paid to butt welding:

1. According to the use requirements, reasonable selection of surfacing alloy

2. Reduce the dilution ratio of base metal as much as possible

3. Improve productivity

4. It is expected that the hardfacing metal and base metal have similar expansion coefficient and phase transformation temperature

Purpose of surfacing welding of Inconel Cladding Tube :


1. Reduce costs

2. Extend service life

3. Reduce maintenance

4. Reduce spare parts

Our Service


High-quality products supplier
Customized products
Flexible requirements for order size

Diverse products
Competitive price
Professional technical and quality team
Professional sales team

RFQ


Q: Are you trading company or manufacturer ?

A: We are manufacturer

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 25-35days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample extra

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us


Product Tags:

cheonny ASME N06600 Inconel Cladding Pipe

      

cheonny ASME Inconel Cladding Pipe N06601

      

cheonny ASME Nickel Alloy inconel cladding

      
Quality UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm for sale

UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangsu Cheonny Overlay Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)